Converting your garage into an Accessory Dwelling Unit (ADU) is one of the best ways to add living space, increase property value, and generate rental income in California. With California’s ADU-friendly laws, homeowners now have more flexibility than ever to turn their underutilized garage into a fully functional living space.
At Best Construction Inc., we specialize in garage ADU conversions in the San Francisco Bay Area, including Sonoma, Contra Costa, San Mateo, and Santa Clara counties. In this guide, we’ll walk you through the step-by-step process of converting your garage into an ADU and everything you need to know about permits, costs, and design considerations.
What is a Garage ADU?
An Accessory Dwelling Unit (ADU) is a self-contained residential unit located on the same property as a primary home. A garage ADU conversion transforms an existing attached or detached garage into a fully livable space with a:
Kitchen
Bathroom
Living Area & Bedroom
Independent Entrance
Why Convert Your Garage into an ADU?
Rental Income Opportunity – Generate passive income by renting out the unit.
Increased Property Value – ADUs can significantly boost resale value.
More Living Space – Great for family members, home offices, or guest suites.
Affordable Housing Solution – ADUs help address California’s housing crisis.
Step-by-Step Guide to Converting Your Garage into an ADU
1. Check Zoning & Permit Requirements
Before starting your garage conversion, you must ensure your property complies with California ADU laws and local zoning codes.
Key ADU Requirements in California:
Lot Must Have an Existing Single-Family or Multi-Family Home
Maximum Size: Up to 1,200 sq. ft., depending on local regulations
No Minimum Lot Size Requirement
Must Have a Separate Entrance
Parking May Not Be Required (if within ½ mile of public transit)
Permitting Process:
- Submit architectural plans to your city planning department.
- Obtain approvals for zoning, fire safety, and structural compliance.
- Secure building permits before construction begins.
At Best Construction Inc., we handle all permit applications and approvals for you!
2. Design Your Garage ADU Layout
Your garage ADU should be functional, efficient, and comfortable. Here are some popular layout ideas:
Studio ADU – Open-concept design with a combined living/sleeping area.
One-Bedroom ADU – Separate bedroom for privacy and comfort.
Two-Bedroom ADU – Ideal for small families or rental units.
Loft-Style ADU – Utilize vertical space with a raised sleeping area.
Space-Saving Tips:
Use open floor plans for a spacious feel.
Install multi-functional furniture (murphy beds, fold-out tables).
Maximize natural light with skylights and large windows.
3. Upgrade Insulation, Plumbing, & Electrical
A garage conversion requires major structural and utility upgrades to meet California’s building code requirements.
Insulation & Climate Control – Install proper insulation (R-19 walls, R-30 ceilings) and HVAC for comfort.
Plumbing & Sewer Connection – Connect to the existing sewer line for bathrooms and kitchens.
Electrical & Lighting – Upgrade wiring for appliances, lighting, and smart home features.
Fire Safety Compliance – Install smoke detectors, CO alarms, and emergency exits.
Pro Tip: Energy-efficient windows and doors reduce heating and cooling costs!
4. Choose High-Quality Finishes & Materials
Your garage ADU should feel modern and welcoming. Consider these finishing touches:
Flooring: Waterproof luxury vinyl plank (LVP) for durability.
Walls & Ceilings: Drywall with soundproof insulation for privacy.
Kitchen: Compact appliances, quartz countertops, and custom cabinetry.
Bathroom: Walk-in shower, space-saving vanity, and modern fixtures.
At Best Construction Inc., we customize your ADU’s design to match your vision and budget!
How Much Does a Garage ADU Conversion Cost? 
The cost of converting a garage into an ADU varies based on size, materials, and local permitting fees.
Expense Category | Estimated Cost |
---|---|
Architectural Plans & Permits | $5,000 – $15,000 |
Foundation & Structural Upgrades | $5,000 – $15,000 |
Plumbing & Electrical | $10,000 – $20,000 |
HVAC & Insulation | $5,000 – $12,000 |
Interior Finishes (Flooring, Cabinets, Paint) | $10,000 – $25,000 |
Labor & General Construction | $30,000 – $80,000 |
Total Cost Estimate | $80,000 – $150,000+ |
Financing Options: Many homeowners use home equity loans, ADU grants, or state-funded loan programs to finance their ADU projects.
How Long Does a Garage ADU Conversion Take? 
The timeline for an ADU conversion depends on permits, design complexity, and construction phases.
Average Garage ADU Timeline:
Planning & Permits – 2 to 4 months
Construction & Utility Installation – 4 to 6 months
Final Inspections & Approvals – 1 month
Total Project Time: 6 to 12 months
Is a Garage ADU Conversion Worth It?
Rental Income Potential: Earn $2,000 – $3,500/month in California’s rental market.
Affordable Housing Solution: Perfect for in-laws, aging parents, or young professionals.
Property Value Increase: ADUs add $100,000+ in resale value.
Example: A Home in San Mateo County
ADU Cost: $100,000
Rental Income: $3,000/month ($36,000/year)
ROI in 3 Years!
Bottom Line: A garage ADU conversion is a smart investment for California homeowners!
Start Your Garage ADU Project with Best Construction Inc.
At Best Construction Inc., we specialize in garage ADU conversions from design to final inspection. Serving homeowners in Sonoma, Contra Costa, San Mateo, and Santa Clara counties, we ensure a smooth, hassle-free ADU construction experience.
Call us today for a FREE consultation!
Serving homeowners in the San Francisco Bay Area
Get a Quote Now!